Microsoft Project logo

Microsoft Project Offline Installer

Standalone installer · Full setup · Offline installer free download for Windows

Office & Productivity · v2023.1 · Paid

Powerful project management software for professionals

Link checked against Microsoft Corporation's official domain on (automated check; catalog maintained by , Editor).
License: Paid
Size: 1.2 GB
Platforms: Windows
Updated:

Quick answer: downloading Microsoft Project

Microsoft Project is a Paid productivity app for Windows from Microsoft Corporation. A verified standalone installer isn't published for Microsoft Project; its official download page is linked below. Always download from the official source (microsoft.com) — we link there directly and never host or modify the file.

Microsoft Project Trust & Verification

External authoritative sources that identify and verify Microsoft Project.

Microsoft Project Offline Installer Downloads

Verified installer files, platform packages, store pages, and browser plugins when available.

Platform Build Architecture Package Download Notes
Windows

Standard package

Microsoft Project for Windows (32-bit)

32-bit Download page Download For older 32-bit systems — check official site for 32-bit build
Windows

Windows 10

Microsoft Project for Windows (64-bit)

64-bit Download page Download Recommended for Windows 10/11

Direct installer links are shown only when verified. Store and browser extension rows open the publisher-controlled official destination.

Source: official download page. A direct standalone offline installer was not confirmed — open the publisher's official page and choose the full/offline package. If only an online (web) installer is offered, use that from the vendor.

We do not host software files on our servers. All download links point to the official developer source or a trusted, verified mirror.

Microsoft Project Overview

Microsoft Project is a professional project-management application for Windows used by project managers to plan, schedule, and track complex projects. It centers on building project schedules with tasks, durations, dependencies, and milestones, visualized as Gantt charts, and on managing resources and costs against a plan. It supports critical-path analysis, baselines, resource leveling, and detailed reporting, and integrates with the Microsoft ecosystem including Project Online/Project for the web and Teams. It is a long-established, powerful tool aimed at formal project management rather than lightweight task tracking. It is a paid product (subscription or one-time), installed via Microsoft's installer. Use the link on this page to reach Microsoft Corporation's official Microsoft Project download.

Microsoft Project Preview

Microsoft Project Office & Productivity preview card
Microsoft Project — Office & Productivity

Lead card by OfflineInstallerSetup. Logo and screenshots from the publisher's official sources and Wikipedia / Wikimedia Commons under their respective licenses.

Microsoft Project Offline Installer Key Features

  • Detailed scheduling with tasks, dependencies, milestones
  • Gantt charts and critical-path analysis
  • Resource and cost management; baselines
  • Detailed project reporting
  • Integrates with the Microsoft ecosystem

Microsoft Project Standalone Installer System Requirements

Baseline requirements to run the current Microsoft Project release:

Operating System
Windows 10 64-bit or later
Memory (RAM)
4 GB RAM minimum
Disk Space
2 GB free disk space
Processor
Intel Core i5 or AMD equivalent

How to Get the Microsoft Project Offline Installer

This listing points to the vendor-controlled source. Use these checks before downloading or installing:

  1. 1

    Open the Microsoft Corporation official source from the downloads table on this page.

  2. 2

    Choose the Microsoft Project package for Windows; the vendor controls which installer, store link, or archive is offered.

  3. 3

    Confirm the publisher name, version, architecture, and system requirements before running the package.

  4. 4

    Avoid mirror download buttons unless the publisher explicitly lists that mirror as an official source.

Microsoft Project Offline Installer FAQ

Is Microsoft Project free?
No. Microsoft Project is a paid product, sold as a subscription (Project Plan) or one-time license, separate from the core Office apps. Free alternatives include OpenProject and GanttProject. This page links to Microsoft's official source.
Who uses Microsoft Project?
Microsoft Project is aimed at project managers handling formal, complex projects, with detailed scheduling, resource management, and critical-path analysis, rather than lightweight task tracking. This page links to the official page.

More Office & Productivity Official Downloads

View all Office & Productivity

Also Popular on OfflineInstallerSetup

Browse all software

Share this page

Help others find official software setup resources.